41-24456

Delivered Cheyenne 13/8/42 with Ben Pickenbrock; Salina 23/11; Cheyenne 30/1/43; Walla Walla 23/2/43; Geiger 30/4/43; Walla Walla 9/5/43; Spokane 25/6/43; Gt Falls 1/8/43; with P.C. Wells force landed base 3/2/44; Reconstruction Finance Corporation (sold for scrap metal in USA) Albuquerque 25/6/45.

Revisions

Date
Contributorjmoore43
Changes
Sources

Added the Production block number and Manufacturer per info on the internet. 

SOURCE:  https://b17flyingfortress.de/en/production-block/b-17f-10-bo-41-24440-4…

 

Date
ContributorAAM
Changes
Sources

Dave Osborne, B-17 Fortress Master Log