41-2450

Delivered Sacramento 17/11/41; MacDill 5/1/42; Project X 18/1/42; Assigned 3BS/6BG Panama 4/3/42; Guatemala 15/4/42; Albrook, CZ 1/11/42; take off accident (from APO 841) 27/5/53 with Bob Charles at (APO 839) Talara, Peru; Written off ??.

Revisions

Date
Contributorjmoore43
Changes
Sources

Added the Production block number and Manufacturer per info on the internet.
SOURCE: https://b17flyingfortress.de/en/b17/41-2450/

Date
ContributorAAM
Changes
Sources

Dave Osborne, B-17 Fortress Master Log